Nevada Appeal staff report

Back to: News
July 31, 2014
Follow News

U.S. 395 project south of Gardnerville to start Sunday

The Nevada Department of Transportation will begin a project to construct turn pockets for enhanced safety and mobility on U.S. 395 south of Gardnerville on Aug. 3.

The approximately $800,000 project by contractor Sierra Nevada Construction will build a right-hand turn lane from southbound U.S. 395 to increase safety and access south of Riverview Drive near the Washoe Tribal Headquarters. A center turn pocket will also be constructed in the highway median to provide for a designated, safer turn in either direction. With as many as 10,000 vehicles traveling the section of highway daily, the turn lanes will help enhance safety and reduce the potential of crashes for those driving in the area.

Construction will take place Sunday evenings through Friday mornings. Minor construction-related traffic impacts will occur during the day, with periodic construction-related lane closures and delays taking place overnight between 8 p.m. and 5 a.m. Motorists are advised to drive at posted construction speed limits, or slower as necessary for conditions. The project is scheduled to be completed by the fall.

Potential future improvements in the area include a frontage road and more extensive turn pockets to align access along U.S. 395.


Explore Related Articles

Trending in: News

The Nevada Appeal Updated Jul 31, 2014 11:31PM Published Jul 31, 2014 11:31PM Copyright 2014 The Nevada Appeal. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.