Work planned on Franktown Road in Washoe Valley, delays expected

  • Discuss Comment, Blog about
  • Print Friendly and PDF

The Nevada Department of Transportation will reseal the pavement surface of State Route 877/Franktown Road on Tuesday and Wednesday.

One-way traffic with traffic controls and pilot cars will be in place to guide motorists through the road work zone, and delays of up to 30 minutes are expected from 7 a.m. and 4 p.m. on both days. Motorists are advised to drive at posted construction speed limits or slower if necessary.

Microsurfacing fills cracks and restores a uniform surface texture to old pavement. The improvements will help protect the pavement by resealing the roadway with a new top layer.

Comments

Use the comment form below to begin a discussion about this content.

Sign in to comment