March 14, 2017
Water still maintains a high level in the V-line canal at a diversion point that will send water to Sheckler Reservoir and the desert.
The installation of four concrete triple-box drainage culverts on U.S. Highway 95 south of Fallon will be completed by Friday.
Comments
Use the comment form below to begin a discussion about this content.
Sign in to comment